|
Highlights of
LANL Project Experience
|
- TA-59-1 Upgrades Project
- NISC 3rd Floor Conversion Project
"Distinguished Performance
Award"
- SEACPRO Title II and III
- LDCC P1-P2 Title II and III
- TA-33 Septic Tank Title II and III
- Microscope Labratory Modifications
- TA-61-28 Lift Station Project
- CMR Deferred Maintenance Project
- Tactical Training Facility - RFP
- SCC 4.8MW GFE Option Title II and III
- TA-03 Substation Modifications
Engineering Study
- SCC Vault Project Title II and III
- FY-06 Deferred Maintenance Small Projects Program
- CCN-DC Office Remodel Project
- Diamond/Eniwetok Intersection Improvement Project
- Pajarito Corridor Road and Parking Project, Title II Services
- SCC/LDCC Water
Cooling Project Engineering Study Project
- LDCC 5th Chiller Engineering Study
- Dusting Chamber Sprinkler Addition, Title II
- FY-07 Roofing Systems
Replacement Project Evaluation and Design
- TA-03 Substation Ground Grid Study Project
|
- Critical Decision 2/3c for TA-03 Substation Upgrades
- Electrical Infrastructure/Safety Upgrades (EISU) Project, TA-9-21, Final Design
- Emergency Operations Center
- Site Wide Fire Alarm System Replacement
- SCC Infrastructure Upgrades Project
- SCC Supercave
- SCC Visualization Theater
- SCC Infrastructure Upgrades
- SCC Freespace Project
- NMSSUP Conceptual Design
- NMSSUP Phase I Alternatives Analysis
- Power Grid Infrastructure
Upgrades Project
- TA-9-21 Electrical Safety Infrastructure Upgrade
- SCC 2.4MW Project
- TA-16-204 Air Conditioning Study
- TA-16 WETF Diesel Generator Relocation
- TA-16-193 Engineering Study
- TA-16-202 Non-Tritium Support and Reconfiguration Project
- TA-16 Shock and Vibration Testing Laboratory
- WETF Refurbishment Project
- TA-16 Fuel Tanks Project
- TA-18 Mission Relocation Project
|
|
460 St. Michaels
Dr., Suite 504 Santa Fe, NM 87505 | (505)455-1211 (505)455-1311 (fax) | 24226 Briones Dr. Laguna
Niguel, California 92677 | (949)389-0103 (949)215-1550 (fax) | | dvigil@vigilenterprises.com |
|